A PHP Error was encountered

Severity: Warning

Message: imagejpeg(./assets/captcha/1571592017.1571.jpg): failed to open stream: Disk quota exceeded

Filename: libraries/antispam.php

Line Number: 144

A PHP Error was encountered

Severity: Warning

Message: Cannot modify header information - headers already sent by (output started at /home/iiksscom/public_html/en/system/core/Exceptions.php:185)

Filename: libraries/Session.php

Line Number: 675

Tehran, Baku discuss completion of north-south transport corridor

Tehran, Baku discuss completion of north-south transport corridor Investment

Tehran, Baku discuss completion of north-south transport corridor

 

Managing Director at Iran's Construction and Development of Transportation Infrastructures Company Ali Noorzad and Head of Azerbaijan Railway Company Javid Qorbanov reviewed the operations for completing the transportation corridor of north-south.

The trend of construction of railway bridge measuring 82.5 meters on Astara river along the joint border, 8.3-kilometer railway from Azerbaijan’s Astara terminal to the border of Iran and the operations which took place in Iran’s soil were discussed during the meeting.
Qorbanov announced that the measures taken place in line with boosting the transit capacities of Azerbaijan necessitates that the operation to complete the north-south transport corridor to be expedited in Azerbaijan’s soil.
The two sides also agreed on the expansion of mutual cooperation.

 

source: irna

News Image Gallery

Tags :

Comments

Send Comment

Tags: